14 / 12 / 2018   Friday   简体中文 | 繁體 | English
 
Home Introduction Project News Notice HSE Technology Culture Regulations
   
 
 
Hot  
 
 
 
Your current position:Home > Details
Details 详细信息
 
 
Construction of Main Bridge Completed
 
Edit:港珠澳大桥网站管理员    Date:2017-02-21    Reading:8269

   On September 24, 2016, the last expansion joint was installed at Pier No.54 on the Qingzhou Channel Bridge. A ceremony was held on the bridge on September 27 to announce the successful connection of all the bridge sections within the Main Bridge Project, which has now entered the final construction stage.

(HZMB Authority)

Copyright:Hong Kong-Zhuhai-Macao Bridge Copyright 2009 All rights reserved
Address: Postcode:519060
Area code:0756 Tel:2191999 Fax:3292000 E-mail:hzmbo@hzmbo.com
You are the: 23081486 visitor

粤公网安备 44049002000156号